On Jun 3rd, Lianyungang Petrochemical First 7.5 KT ship of EG left the factory, which marked Lianyungang Project going through the shipping sales process of EG. It would lay a solid foundation for the high load and stable production.
Since the EO/EG units went into operation, the team communicated repeatedly on several key indicators of the products, optimized the proposal and finally, got the optimal operation control parameters. At the same time, they coordinated with QA Department to follow the analyzing results of the samples, by comparing, analyzed and eliminated the factors that affected the quality according to the parameters historical trend analysis.

With EG entering the market, the Marketing Department established rapports with terminal clients by understanding the needs of front-line clients, promote quality continuously and improved after-sales service in order to provide good products and service for the clients.
The shipment of EG is a milestone in products sales of STL. In the future, STL will carry out domestic and international cooperation, insist on the development direction of ‘industrial chain integration’, ‘large-scale’ and ‘technologizing’, do a good job in the supplying, extending, and strengthening of the existing industry and make a better contribution to the regional economic development.